Alfa Romeo Forums banner

1 - 4 of 4 Posts

·
Registered
Joined
·
53 Posts
Discussion Starter #1
Looking for advice/help as to when it is recommended to permanently weld sills(inners mids and outers) and floors(front and rear) into place.
The car has been totally stripped down to the bare chassis jigged and pulled back into shape and braced the LHS sills (all) have been removed and in the process of fitting LHS floors.
What else needs to be checked before committing sills and floors to the chassis?
Any help greatly appreciated
 

·
Premium Member
Joined
·
487 Posts
Make sure the gearbox mount and central mount are in place before you start putting the floors in. You wouldn't be the first one to end up with a narrow tunnel as it is very flimsy and easily compressed.
 
1 - 4 of 4 Posts
Top