View Single Post
  #28 (permalink)  
Old 05-25-2006, 10:16 AM
Keven's Avatar
Keven Keven is offline
Registered User
 
Join Date: Feb 2003
Location: Rancho Palos Verdes, CA
Posts: 863
Finally some progress. I made the tranny cover/tunnel from a single
piece of 18ga steel, using a band saw and a bender (at work )
I think it came out pretty nice. I then fit the tunnel with the floors,
and made some L brackets to join them at the seams. I hindsight,
I should have bent seams on the tunnel to begin with, but it all should
weld up nice and strong. I am going to add a small lip where the tunnel
meets the firewall for added strength, and will add a couple of bent
tube braces to the inside of the tunnel for rigidity, and to prevent any
vibration or oscillations while driving. I then carefully measured the
distance to the S2000 shifter, and cut a hole for it. I ordered the
stock S2000 shift boots and brackets to make it all nice and weather
proof, and quiet (see the S2000 parts diagram below). Will now begin
tacking it all in, and it's off to the dipper!!
Attached Images
    
__________________
1971 GTV ongoing "restoration" project (Rice Conversion)
1978 Spider sold in 1996
1962 Guilietta Spider sold looong ago
Reply With Quote